Commercial project answer summary

  • Commercial scopes are specified after inspection, including preparation standard, coating build, and staging constraints.
  • Programme timing depends on access windows, cure requirements, and WHS controls for active workplaces.
  • Written scopes and documented inclusions reduce variation risk and support contractor-side comparison.
Request a commercial scope review
Illustrative finish example

Surface Preparation for Builders & Fitouts

Builder-grade concrete surface preparation for Sydney construction and fitout projects. We align with your construction program, work to hold point inspections, and deliver written pre-cover documentation for project quality records.

What We Deliver for Builders

From initial grinding through to pre-cover sign-off, we provide the documentation and delivery that commercial programs require.

Builder-Spec Preparation

Surface preparation to AS 1884, manufacturer specifications, or project-specific documentation.

Program Alignment

We slot into your construction program and provide written confirmation of access windows and delivery dates.

Hold Point Inspections

We notify your team when surfaces are ready for inspection and document outcomes for project records.

Builder Relationships

We work with head contractors, project managers, and fitout teams across Sydney commercial projects.

Pre-Cover Reports

Written documentation of surface condition, profile achieved, moisture levels, and remediation completed.

Crack Repair & Remediation

Structural and cosmetic crack repairs to builder specification before coating or tiling proceeds.

Construction Program Alignment

We understand how construction programs work. Surface preparation is a critical predecessor activity — delays to grinding directly impact tiling, coating, and fitout trades.

During quoting, we confirm the required access window, lead times, and milestone dates so your program reflects an accurate picture. We provide written booking confirmation so project managers can rely on our commitment.

  • Written booking confirmation with start and completion dates
  • Hold point notification when surface is ready for inspection
  • Pre-cover reports for project quality documentation
  • Crack repair and remediation within scope
  • Works to AS 1884 and manufacturer specifications

Builder Preparation Standards

Surface ProfileCSP 2–5 to AS 1884 or manufacturer spec
Moisture TestingDocumented pre-coating moisture readings
DocumentationWritten pre-cover inspection report
Insurance$20M public liability
Lead Time3–4 weeks standard, 6–8 weeks for large projects

What surface preparation is needed before tiling or coating?

Before tiling or coating, concrete must be ground flat to the specified level, free of laitance, curing compounds, bond-breaking agents, and surface contamination. We use diamond grinding equipment to achieve CSP 2–5 profiles depending on the specified system. We provide a written pre-cover inspection report documenting surface condition and any remediation completed.

Discuss your builder requirements

How do you coordinate with a construction program?

We align directly with the construction program timeline provided by the head contractor or project manager. We confirm access windows, hold points, and lead times during the quotation phase so our scope can be inserted accurately into the program. We provide confirmation of booking and expected completion dates in writing.

Discuss your builder requirements

Can you provide a builder's report for surface preparation?

Yes. We provide written surface preparation reports documenting the condition of the concrete before and after grinding, moisture readings, surface profile achieved (CSP), and any crack repairs or remediation completed. These reports are suitable for inclusion in project quality documentation and can be provided in PDF format.

Discuss your builder requirements

What is a hold point inspection for surface preparation?

A hold point inspection is a mandatory check in the construction program where work cannot proceed until the prepared surface is inspected and approved. We work to hold points specified by the architect, specifier, or head contractor. We can notify the relevant party when the surface is ready for inspection and document the outcome.

Discuss your builder requirements

Do you work to builder specifications for surface preparation?

Yes. We work to standard and custom builder specifications including AS 1884, manufacturer system specifications, and project-specific documentation. If a particular coating or tile supplier specifies a surface profile or preparation standard, we prepare the surface to meet it and document compliance.

Discuss your builder requirements

How far in advance should we book surface preparation for a fitout?

We recommend booking at least 3–4 weeks ahead for standard fitout preparation work. For large projects or those requiring specific after-hours access, 6–8 weeks is preferred. Early booking allows us to align with your program, confirm access requirements, and avoid program delays. Contact us with your program and we can confirm a realistic lead time.

Discuss your builder requirements

Working on a Sydney fitout project?

Send us your program and we will confirm lead times and availability. Written quotes provided within 24 hours for standard projects.