Concrete Grinding Cost Guide Sydney
Plan concrete grinding costs for Sydney floors by coating removal, slab hardness, floor size, dust control, access, surface profile, and whether grinding is part of epoxy, polishing, or restoration work.
Service benefits
- Grinding removes coatings, adhesives, laitance, and weak surface material
- Preparation quality controls coating bond and polished concrete outcomes
- Dust-managed equipment supports residential, commercial, and fitout sites
Pricing and project context
Concrete grinding pricing depends on square metres, coating or adhesive removal, slab hardness, edge work, dust control, repairs, access, finish target, and disposal requirements.
FAQs
Is concrete grinding dusty?
We use industrial vacuum extraction systems directly attached to our grinders. Our process is virtually dust-free.
Can concrete grinding level uneven floors?
Yes. Diamond grinding effectively removes high spots, lippage, and minor unevenness across concrete floors.
How long does concrete grinding take?
A standard residential garage (40–60sqm) typically takes 4–6 hours for grinding preparation. Larger commercial floors are staged across multiple days. Surface Master Australia schedules grinding and coating as a continuous process where possible to reduce total project time.
What equipment is used for concrete grinding?
Surface Master Australia uses commercial planetary multi-head diamond grinders for all projects. These machines use rotating satellite heads that deliver consistent CSP 2–4 profiles across the full slab. Industrial HEPA extraction is run in line with all grinding equipment.
Request a written quote
Call 0424 907 758 or request a free written quote before work starts.
Request a free quote